Case Study

Vveda Pty Ltd

Project Size:

6.65kW Rooftop Solar

 

Vveda Pty Ltd, a forward-thinking business based in NSW, has embraced renewable energy by installing a rooftop solar system to power its daily operations. With a focus on innovation and efficiency, Vveda recognised the importance of sustainable energy practices both for cost savings and environmental responsibility.

Working with AYKA Solar, a 6.65kW solar system was expertly installed to match the company’s energy needs during business hours. This clean energy solution now supports office equipment, lighting, and digital systems, helping Vveda reduce its reliance on grid electricity while shrinking its carbon footprint.

Key Project Stats

27 kWh in daily generation

82% self-sufficiency overall

Office operations powered by solar energy

OBJECTIVES

Vveda Pty Ltd set out to reduce rising energy costs and align its operational practices with its core values of sustainability and innovation. The goal was to implement a reliable solar solution that would decrease dependence on the grid, improve energy efficiency, and reinforce the company’s commitment to environmental stewardship—all without disrupting daily workflows.

SOLUTION

AYKA Solar designed and installed a 6.65kW rooftop solar system tailored to Vveda’s energy consumption profile. The system at Heartland Motors features high-efficiency solar panels paired with a smart inverter setup, designed to maximise energy production during peak daylight hours when the business is busiest. A simple, easy-to-use monitoring system gives the team real-time updates on how much energy they’re producing and saving.

The entire installation was planned to minimise disruptions to their daily operations, ensuring no impact on the workshop or showroom. It was a smooth shift to clean energy that made sense on every level.

"Switching to solar just made sense for us—it’s helping us cut costs while staying true to our commitment to running a smarter, more sustainable business."

— Vveda Pty Ltd Management

CHALLENGES

The roof space was tight, and the office had to remain operational throughout the installation, so there wasn’t much room for error. The AYKA Solar team carefully mapped out the layout, placing each panel to optimise performance while minimising wasted space. They ensured everything was set up smoothly, allowing the system to function without interfering with daily work inside the building.

THE FUTURE

Since going solar, Vveda Pty Ltd is considering additional energy-saving initiatives, such as LED lighting upgrades and energy-efficient appliances. The company also plans to promote its clean energy adoption to clients and partners, strengthening its reputation as a sustainable, future-focused organisation. Solar power is now a cornerstone of Vveda’s operational strategy, driving both financial and environmental benefits.

“We wanted to future-proof our business, and solar was the logical choice. It’s an investment in savings and sustainability.”

Vveda Pty Ltd Management

More Projects

Austpath Laboratories, Northmead, NSW – 100kW

Overview: Installed a 100kW on-grid solar system with 263 REC 380W panels and German-made SMA inverters.

Outcome: Significant reduction in operational costs and environmental footprint with high-efficiency panels and reliable inverter technology.

Church, Thornleigh, NSW – 25kW

Overview: Installed a 25kW solar system with Longi panels and a European-made Fronius inverter.

Outcome: Consistent energy savings and reduced grid dependence for the church.

Fruit World, Luddenham, NSW – 40kW

Overview: Installed a 40kW solar system using Trina panels and a 29.9kW Huawei inverter.

Outcome: Enhanced energy efficiency and reduced electricity bills through consistent energy production.

Swimming center, Hornsby, NSW – 38.7kW

Overview: A 38.7kW system with Longi Half-Cut Monocrystalline 450W panels and a 29.9kW Huawei inverter was deployed.

Outcome: Reduced energy expenses and a greener footprint with high energy yield.

Commercial Installation – 22.2kW

A 22.2kW system was installed using a combination of an Austrian made Fronius inverter and Trina 370W Half cell monocrystalline panels in solar power plant.

Supreme Engineering, Blacktown, NSW – 20kW

Overview: A 20.7kW system with Longi  panels and a 20kW Fronius inverter was deployed.

Outcome: Reduced energy expenses and a greener footprint with A powerful and efficient system

×