Case Study
ASP Building Services PTY LTD

Project Size:
6.6kW Rooftop Solar
ASP Building Services PTY LTD, a trusted name in construction and property maintenance across NSW, has made a smart move by switching its office operations over to solar power. Known for delivering high-quality building solutions, the company saw solar as a natural extension of its values—efficiency, innovation, and environmental responsibility.
With the support of AYKA Solar, a 6.6kW rooftop solar system was installed to align with the company’s typical daytime energy use. Now, core operations, including communications, planning tools, and day-to-day administrative tasks, are powered by clean, renewable energy, reducing both running costs and environmental impact.
Key Project Stats
26 kWh in daily solar generation
80% daytime energy self-sufficiency
Office and planning systems powered by solar
OBJECTIVES
ASP Building Services aimed to reduce electricity expenses while improving energy independence and corporate sustainability. With rising energy costs and an increased focus on greener practices within the construction industry, the company recognised the need to adopt clean technologies internally. Solar was not just a cost-saving measure—it was a strategic move to align with environmentally conscious clients, improve operational efficiency, and set a leadership example in the building services sector.
SOLUTION
AYKA Solar provided a customised 6.6kW solar system tailored to the office’s peak energy use during working hours. The system uses high-efficiency panels paired with a smart inverter to deliver steady, reliable power all day long. With real-time monitoring, the team can easily keep track of how much energy they’re producing and using.
The installation was quick and smooth, causing almost no disruption, so ASP Building Services could keep working without missing a beat. From day one, the company began generating clean power, reducing grid dependence and long-term electricity expenses.
“As builders, we believe in quality and future-proofing. Solar is a smart investment that benefits both our business and the environment.”
ASP Building Services Management

CHALLENGES
The primary challenge was optimising the limited roof space for maximum output. Additionally, because office systems and planning tools must operate without interruption, the solar installation had to be precisely coordinated to avoid impacting daily operations.
AYKA Solar conducted a comprehensive site inspection and delivered a streamlined installation using top-tier components. Each panel was carefully placed to get the most out of the space, delivering reliable solar power without taking up more room than needed.
THE FUTURE
Now that solar energy powers the majority of their daily operations, ASP Building Services PTY LTD is looking into other sustainable upgrades, such as LED lighting and intelligent climate control. The solar system’s real-time data is also helping guide energy strategies, while the company proudly highlights its solar investment in client discussions and stakeholder updates. Going forward, ASP continues to integrate sustainability into both its services and operations, proving that green thinking has a strong place in the building industry.

“Solar energy has made our operations more efficient and eco-friendly. It’s more than an upgrade; it’s a step toward a greener future.”
ASP Building Services Management
More Projects
Austpath Laboratories, Northmead, NSW – 100kW
Overview: Installed a 100kW on-grid solar system with 263 REC 380W panels and German-made SMA inverters.
Outcome: Significant reduction in operational costs and environmental footprint with high-efficiency panels and reliable inverter technology.
Church, Thornleigh, NSW – 25kW
Overview: Installed a 25kW solar system with Longi panels and a European-made Fronius inverter.
Outcome: Consistent energy savings and reduced grid dependence for the church.
Fruit World, Luddenham, NSW – 40kW
Overview: Installed a 40kW solar system using Trina panels and a 29.9kW Huawei inverter.
Outcome: Enhanced energy efficiency and reduced electricity bills through consistent energy production.
Swimming center, Hornsby, NSW – 38.7kW
Overview: A 38.7kW system with Longi Half-Cut Monocrystalline 450W panels and a 29.9kW Huawei inverter was deployed.
Outcome: Reduced energy expenses and a greener footprint with high energy yield.
Commercial Installation – 22.2kW
A 22.2kW system was installed using a combination of an Austrian made Fronius inverter and Trina 370W Half cell monocrystalline panels in solar power plant.
Supreme Engineering, Blacktown, NSW – 20kW
Overview: A 20.7kW system with Longi panels and a 20kW Fronius inverter was deployed.
Outcome: Reduced energy expenses and a greener footprint with A powerful and efficient system