Case Study

Heartland Motors Pty Ltd

3 14

Project Size:

99.12kW Rooftop Solar

Zorawar Homes Pty Ltd, a respected name in custom home construction and property development across NSW, has taken a bold step toward sustainability by investing in solar energy for its office operations. As a company committed to building future-ready homes, it was only fitting to lead by example with a clean energy transition of their own.

In collaboration with AYKA Solar, a 99.12kW Commercial Solar Panels Installation In NSW was completed, tailored to meet the high daytime energy demands of their active office environment. From design studios and administrative departments to project planning and client meetings, the entire business now runs on solar-powered efficiency—delivering both environmental and financial benefits every day.

Key Project Stats

Coloured Fractal 1

420 kWh in daily generation

Coloured Fractal 2

75% self-sufficiency overall

Coloured Fractal 5

Reliable solar support for workshop tools, lighting, and showroom equipment

OBJECTIVES

Heartland Motors approached this project with a clear focus on improving both efficiency and sustainability. One of their main goals was to reduce the rising and unpredictable electricity costs associated with running a large automotive business. They also aimed to future-proof their operations by transitioning to a clean, renewable energy source. With the high power demands of their workshop and showroom, a reliable energy supply was critical. At the same time, it was essential that the Commercial Solar Panels Installation In NSW be completed without disrupting daily business operations.

As Christopher Scholfield explains:
“In a business like ours, where power usage is heavy and consistent, going solar just made sense—both financially and environmentally.”

SYSTEM SPECIFICATION

Project Size: 99.12 kWp

Panel Type: 168 X JA 590W
(JAM72D40-590/MB) Panels

Inverter Type: 1 x Sungrow 110kW 3-Phase Inverter (SG110CX-P2)

SOLUTION

Smart Commercial Solar custom-designed a 99.12kW Commercial Solar Panels Installation In NSW specifically tailored to meet the energy demands of Heartland Motors. The system was engineered to handle peak daytime loads across both the workshop and showroom, significantly reducing reliance on grid electricity.

Built to withstand local weather conditions, the installation includes advanced remote monitoring capabilities, allowing the Heartland team to track performance in real-time. This smart solution not only enhances operational efficiency but also empowers the business to stay informed, in control, and committed to sustainable energy use.

“We mapped out the site to maximise solar exposure without interfering with business operations. The result is a high-performance system that blends seamlessly into Heartland’s daily rhythm.”

— Senior Project Manager

Commercial Solar Panels Installation In NSW

CHALLENGES

Installing a solar system in the fast-paced environment of an automotive business like Heartland Motors presented unique challenges. Uninterrupted power was essential for running high-load workshop equipment critical to daily operations. The team also had to navigate an existing roof structure and complete the project within tight timeframes to avoid disrupting business activities.

Moreover, the solar solution needed to be precisely engineered to meet the site’s fluctuating energy demands throughout the day. To overcome these challenges, Smart Commercial Solar worked closely with the Heartland team to deliver a customised Commercial Solar Panels Installation In NSW. The result was a safe, efficient installation that met all performance requirements—executed seamlessly without interrupting business operations.

THE FUTURE

With the Commercial Solar Panels Installation In NSW now running at full capacity, Heartland Motors is already exploring new ways to expand its clean energy journey. These forward-thinking initiatives include:

  • Battery storage to extend solar energy usage into the evening hours

  • EV charging solutions to future-proof the business for the growing electric vehicle market

  • Sharing solar insights and performance data with other dealerships in their network

The success of this installation not only reduced operational costs but also positioned Heartland Motors as a sustainability leader within the automotive industry.

Commercial Solar Panels Installation In NSW

RESULTS

  • Estimated annual energy production: ~143,724 kWh / year
  • Estimated savings on energy bills: Up to ~80% 
  • Payback period (typical estimate): ~5 years 

ENVIRONMENTAL BENEFITS

  • Trees planted equivalent: Offsets carbon ≈ 1,772 trees / year
  • Fuel saved (petrol equivalent): ~46,267 litres / year
  • Greenhouse gas saved: ~45,273 kg CO₂ / year (≈ 45.27 tCO₂ / year)

“This isn’t just about lowering costs—it’s about leading by example. We want our customers and our community to see that sustainable business is smart business.”

— Christopher Scholfield

More Projects

Austpath Laboratories, Northmead, NSW – 100kW

Overview: Installed a 100kW on-grid solar system with 263 REC 380W panels and German-made SMA inverters.

Outcome: Significant reduction in operational costs and environmental footprint with high-efficiency panels and reliable inverter technology.

Church, Thornleigh, NSW – 25kW

Overview: Installed a 25kW solar system with Longi panels and a European-made Fronius inverter.

Outcome: Consistent energy savings and reduced grid dependence for the church.

Fruit World, Luddenham, NSW – 40kW

Overview: Installed a 40kW solar system using Trina panels and a 29.9kW Huawei inverter.

Outcome: Enhanced energy efficiency and reduced electricity bills through consistent energy production.

Swimming center, Hornsby, NSW – 38.7kW

Overview: A 38.7kW system with Longi Half-Cut Monocrystalline 450W panels and a 29.9kW Huawei inverter was deployed.

Outcome: Reduced energy expenses and a greener footprint with high energy yield.

Commercial Installation – 22.2kW

A 22.2kW system was installed using a combination of an Austrian made Fronius inverter and Trina 370W Half cell monocrystalline panels in solar power plant.

Supreme Engineering, Blacktown, NSW – 20kW

Overview: A 20.7kW system with Longi  panels and a 20kW Fronius inverter was deployed.

Outcome: Reduced energy expenses and a greener footprint with A powerful and efficient system