Case Study

Ashmor Plumbing Pty Ltd

3 14

Project Size:

22.2kW Rooftop Solar

Commercial Solar System in Kenthurst NSW

Ashmor Plumbing Pty Ltd is recognised for its high standard of work and dedication to environmentally responsible, resource-efficient, and sustainable plumbing solutions for homes, businesses, and industry. By working with AYKA Solar, Ashmor Plumbing is making a bold decision to bring its day-to-day energy consumption in line with its eco-conscious values.

This Commercial Solar System in Kenthurst NSW is not just about saving on power bills—it is part of a broader strategy to reduce carbon emissions and demonstrate leadership in responsible business practices within the construction and trades industry.

Key Project Stats

Coloured Fractal 1

22.2kW rooftop solar system

Coloured Fractal 2

Estimated 85–90% daytime energy self-sufficiency

Coloured Fractal 5

Projected annual carbon offset: ~29 tonnes CO₂

OBJECTIVES

Ashmor Plumbing wanted to reduce its dependence on the grid and protect its business from increasing power bills. With electricity-fuelled activity and a growing number of vehicles and equipment, the business viewed solar as a sensible and sustainable choice.

This Commercial Solar System in Kenthurst NSW was designed to future-proof their operations and help them make meaningful contributions toward achieving their sustainability goals. What they required was a solution that would operate dependably in varying load conditions—particularly during peak workshop activity hours.

“Sustainability is not only about the planet,” said the company’s operations manager. “It’s about creating a smarter, stronger business.”

SYSTEM SPECIFICATION

Project Size: 22.2 kWp

Panel Type: 60 X Trina 370W Halfcut Mono
Inverter Type:1 X Fronius Symo 20kW 3P 

SOLUTION

AYKA Solar delivered a 22.2kW rooftop Commercial Solar System in Kenthurst NSW, tailored to Ashmor Plumbing’s daily operational profile. The system was designed to offset the majority of daytime energy use, particularly during high-demand periods such as machinery operation, tool recharging, and administrative work.

Using Tier-1 solar panels and a high-efficiency inverter system, the installation ensures long-term reliability and maximum energy capture.

All work was completed with minimal disruption to day-to-day business, thanks to a carefully scheduled installation process.

“The install team was efficient, professional, and respectful of our space—we didn’t lose a single day of productivity.”

Ashmor Plumbing Operations Manager

1608604359000

CHALLENGES

One of the primary challenges in delivering this Commercial Solar System in Kenthurst NSW was integrating the solar setup into an active workshop environment without interfering with ongoing operations. The electrical infrastructure also required minor upgrades to support future expansion, including potential EV charging.

The installation team worked closely with Ashmor’s onsite personnel to stage the works and schedule downtime strategically. Attention was also paid to ensuring that the system layout allowed for future battery storage add-ons, supporting longer-term sustainability ambitions.

“We wanted flexibility. AYKA Solar designed a system that meets our needs now, and leaves room for tomorrow.”

Ashmor Plumbing Director

THE FUTURE

THE PERFECT TIME TO LOOK INTO BATTERY STORAGE AND EV CHARGERS.
At the time of installing their high-performance Commercial Solar System in Kenthurst NSW, Ashmor Plumbing Pty Ltd had already been considering the addition of efficient battery storage for EV charging. On-site solar will have the potential to contribute to sustainable power for future transportation requirements as their fleet becomes hybrid or electric-powered.

The project, which has been successfully delivered, has not only cut operational costs but also strengthened Ashmor’s philosophy of innovative and forward-thinking business—a solid foundation for a greener, more resilient future.

1608604351536

RESULTS

  • Estimated annual energy production: ~32,190 kWh / year

  • Estimated savings on energy bills: Up to ~80%

  • Payback period (typical estimate): ~5 years 

ENVIRONMENTAL BENEFITS

  •  Trees planted equivalent: Offsets carbon ≈ 397 trees / year

  • Fuel saved (petrol equivalent): ~10,365 litres / year

  • Greenhouse gas saved: ~10,140 kg CO₂ / year (≈ 10.14 tCO₂ / year)

“Ashmor Plumbing is a great example of how trades-based businesses can lead the way in practical sustainability. We’re proud to have delivered a solution that saves money, cuts emissions, and supports long-term business growth.”

AYKA SOLAR Project Manager

More Projects

Austpath Laboratories, Northmead, NSW – 100kW

Overview: Installed a 100kW on-grid solar system with 263 REC 380W panels and German-made SMA inverters.

Outcome: Significant reduction in operational costs and environmental footprint with high-efficiency panels and reliable inverter technology.

Church, Thornleigh, NSW – 25kW

Overview: Installed a 25kW solar system with Longi panels and a European-made Fronius inverter.

Outcome: Consistent energy savings and reduced grid dependence for the church.

Fruit World, Luddenham, NSW – 40kW

Overview: Installed a 40kW solar system using Trina panels and a 29.9kW Huawei inverter.

Outcome: Enhanced energy efficiency and reduced electricity bills through consistent energy production.

Swimming center, Hornsby, NSW – 38.7kW

Overview: A 38.7kW system with Longi Half-Cut Monocrystalline 450W panels and a 29.9kW Huawei inverter was deployed.

Outcome: Reduced energy expenses and a greener footprint with high energy yield.

Commercial Installation – 22.2kW

A 22.2kW system was installed using a combination of an Austrian made Fronius inverter and Trina 370W Half cell monocrystalline panels in solar power plant.

Supreme Engineering, Blacktown, NSW – 20kW

Overview: A 20.7kW system with Longi  panels and a 20kW Fronius inverter was deployed.

Outcome: Reduced energy expenses and a greener footprint with A powerful and efficient system